ZATCA Phase 2 6-Check Compliance Checklist

Verify every cryptographic precondition and all 6 mandatory Standard (B2B) & Simplified (B2C) XML documents before requesting your Production CSID (PCSID).

ZATCA Phase 2 CSID Onboarding Simulator

6-Document Compliance CSID Checklist

PCSID Readiness Score: 0 of 10 checks passed0%

Step 1: Cryptographic & Hash-Chain Preconditions

Step 2: The 6 Mandatory Compliance CSID Test Documents

6 compliance document(s) still remaining before PCSID

Next fix: Verify buyer SchemeID (NAT/CRN/TIN) and ensure KSA-5 SupplyDate is populated for Standard B2B invoices.

How to Pass the 6 ZATCA Phase 2 Compliance Checks

Whether you are onboarding on the ZATCA Developer Sandbox, Fatoora Simulation Portal, or Production environment, ZATCA requires every EGS (E-Invoicing Generation Solution) unit to successfully submit six distinct UBL 2.1 XML documents using its Compliance CSID before unlocking the Production CSID (PCSID).

Related ZATCA Phase 2 Developer Guides & Tools